Make sure the braces are level and lay down a barrier of wire mesh over the existing concrete inside of the barrier.
How to put cement on floor.
Then mix about 50 lb 23 kg of the leveling compound in 20 cups 4 700 ml of water.
We go over all the necessary steps for your concrete slab to come out perfect.
Check with wedi schluter laticrete goboard or whichever manufacturer to see how they want their product installed over a concrete subfloor.
It just seems so much easier to maintain and cheaper than any other surface.
To lay new concrete sweep and clean the old concrete and saturate the old concrete with water.
Unlike wood or drywall sub surfaces cement backerboard will not rot warp or grow mold and mildew when exposed to water.
Then nail the flooring planks with a standard flooring nailer see photo for details.
Never install new tiles over existing tiles or onto an unprotected wood or plywood floor.
First apply a concrete leveling primer to the entire floor with a push broom.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
Wait 3 hours for it to dry.
In this video we show you how to pour your basic 16 x 12 concrete slab.
The floor beneath the carpet is already concrete so i d probably just have to remove the glue sand it a bit stain it hen put a clear coat on.
Then build a perimeter or a wood brace that is the same height as you want the concrete to be.
If you want to replace an old cracked tile floor or other type of flooring with new ceramic tile it s absolutely imperative that you create a solid.
This guide will teach you how to properly lay cement backerboard and use mortar to secure and level your subfloor before installing tile.
Pour the mixture onto the floor letting gravity take it into the lower areas of the floor.
This can be beneficial if you are wanting to insulate concrete from an electric floor heating system above it.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Fill in low spots with a concrete self leveling compound.
Laying cement board is the easiest way to assure a solid durable base for a ceramic tile floor.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
The other is foam backer board which is ok to install over concrete.
Wait until your concrete floors are dry before you prime.